ECG Industries, Inc. has the experience to handle your construction and remediation needs.
Below are some examples of successful projects completed by ECG.
Kathy McPeters, Contracting Officer, (704) 271-4779, ext. 232
U.S. Dept. of the Interior, National Park Service
Blue Ridge Parkway
400 BB&T Building, One Pack Square
Asheville, NC 28801
Contract Amount
$85,712
Type of Project
Installation of 3 air sparging wells and 2 soil vapor extraction wells, fabrication of equipment for air sparging and soil vapor extraction systems, installation of air sparging and soil vapor extraction equipment, construction of prefabricated metal building to house air sparging and soil vapor extraction equipment and controls, initial startup of system, monthly monitoring and evaluation of system operation for three years, quarterly sampling of monitoring wells, preparation of quarterly monitoring reports and system maintenance.
Location
Balsam Gap UST Site, Jackson County, North Carolina
Base Realignment and Closure ProgramRemoval Actions, Zone 1, Ft. Pickett, VA
Project Name
Base Realignment and Closure Program
Removal Actions, Zone 1, Ft. Pickett, VA
Contract Number
DACA62-98-C-0084
References
Francis Gilmore, BRAC Environmental Coordinator
U.S. Army Corps of Engineers
Fort Pickett Field Office
Blackstone, VA 23824
(804) 292-6651
Contract Amount
$240,840.73
Type of Project
Preparation of project workplans and addenda; caracterization , removal and disposal of metallic debris; removal and disposal of electrical transformers; characterization , removal and disposal of 20 drums of unknown substances and materials; characterization, removal and disposal of 300 tons of contaminated soil; removal and disposal of 2 oil/water separators and 2 USTs.
Location
Fort Pickett, Blackstone, VA
Performance Period
270 days
Start Date
July 1999 (Projected - Notice to proceed not issued)
David Rule, Contracting Officer
(215) 595-0635
Naval Facilities Engineering Command
10 Industrial Highway, mail Stop #82
Lester, PA 19113-2090
Contract Amount
$943,093.02 (Base Year)
Type of Project
Remove & Dispose of underground storage tanks (USTs) and piping and aboveground storage tanks (ASTs); testing, removal & disposal of tank contents; contaminated soil removal & disposal; site restoration. Install ASTs and piping.